Saving Results to Baselines
Moderator: Intaver Support
-
- Posts: 25
- Joined: Tue Dec 18, 2007 3:39 pm
- Location: USA, MI
Saving Results to Baselines
There is not an option to select probabilistic data baseline. Even after disabling risks and uncertainties. Only options given are deterministic, low, base, high and results based on percentile.
Project Engineer
-
- Posts: 1024
- Joined: Wed Nov 09, 2005 9:55 am
Re: Saving Results to Baselines
With all previous versions prior to the release of version 7.1, probabilistic results were not saved with baselines. All risk and uncertainties could be saved, but you can only view the deterministic results in the Manage Baseline views. Previous version is shown below.

In version 7.1, the Set Baseline dialog box now includes the option to save the results with a baseline.

However, even though the results of the simulation are saved with the baseline, in the Manage Baselines dialog box, the data that is shown is still the deterministic values, not the “risked” values.

You must still select the baseline “x” and click OK to view the simulation results.
If multiple baselines exist, you can view the difference between the status of a risk in the different baselines in the Risk Information > Risks in Different Baselines tab.


In version 7.1, the Set Baseline dialog box now includes the option to save the results with a baseline.

However, even though the results of the simulation are saved with the baseline, in the Manage Baselines dialog box, the data that is shown is still the deterministic values, not the “risked” values.

You must still select the baseline “x” and click OK to view the simulation results.
If multiple baselines exist, you can view the difference between the status of a risk in the different baselines in the Risk Information > Risks in Different Baselines tab.

Intaver Support Team
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com