Search found 4 matches
- Tue Apr 17, 2012 12:46 pm
- Forum: RiskyProject: Project risk management and risk analysis software
- Topic: Risk Matrix - More than 3 colour bands possible?
- Replies: 1
- Views: 19143
Risk Matrix - More than 3 colour bands possible?
My organization uses a 5x5 Matrix with 5 Levels of risk as their common reporting policy: For Threats: Low Threat - Green Medium Threat - Yellow Significant Threat - Orange High Threat - Red Very High Threat - Bright Red For Opportunities (still in development) - They use the same designators (Low t...
- Fri Mar 13, 2009 8:32 am
- Forum: RiskyProject: Project risk management and risk analysis software
- Topic: Duration convergence affecting Cost Validity?
- Replies: 1
- Views: 20505
Duration convergence affecting Cost Validity?
If I am interested in only doing a simple model of Cost Impacts and use a single task with all cost risks assigned to it, would the solution for the Cost Risk be invalid since the convergence is based on duration? Would it be better to: Use a single task with an extremely wide range of duration with...
- Wed Nov 23, 2005 1:41 pm
- Forum: RiskyProject Project Risk Analysis Software Issues
- Topic: Drop Down Calendar Incorrect
- Replies: 2
- Views: 33373
- Tue Nov 22, 2005 1:10 pm
- Forum: RiskyProject Project Risk Analysis Software Issues
- Topic: Drop Down Calendar Incorrect
- Replies: 2
- Views: 33373
Drop Down Calendar Incorrect
While entering a constrained date in the Task Information Panel, I used the Calendar Selection.
The Calendar displayed is "Off". It is showing 11 November 2005 as a Sunday when it was a Friday.
Intaver Support: Please investigate and report back.
The Calendar displayed is "Off". It is showing 11 November 2005 as a Sunday when it was a Friday.
Intaver Support: Please investigate and report back.