Assigning Low and High Estimates for Duration and Cost for Group of Tasks

You may assign statistical distribution for duration and fixed cost for a selected group of tasks:

  1. Open the Gantt View.
  2. Select a group of tasks.
  3. Right-click on a Task ID.
  4. Select Set Low/High Duration or Low/High Fixed Cost.
  5. Enter fixed values or use coefficients to calculate Low, Most Likely, and High duration or cost based on Base duration or Cost.
  6. Select a distribution from the drop-down list.
  7. Click OK to apply changes.

You may clear the statistical distribution for a particular group of tasks. To do so, go to the same dialog and select 'Set low, most likely and high duration equal base duration' for duration or 'Set low, most likely and high cost equal base cost' for cost.

See also

Adding 3-point estimates
Assigning low and high estimates for duration and cost to a group of tasks