Simulation Results View
The Simulation Results view shows the results of the probabilistic analysis of
the schedule. You can use these views for the reporting and analysis of your
results.
Default fields
- Success: The chance that a task will be completed. A task can be canceled in one
of 3 cases:
- if the risk cancels task or cancel tasks + all successor has
occurred • if task has reached a deadline
- if project has reached a deadline
and task finish time is beyond such deadlines.
- success rate can be calculated in
of probabilistic calculation. It equals number of iterations in which the task has been
completed divided by the total number of iterations.
- Low Duration (Mean): Low duration as a result of probabilistic calculations. It
is blank for current schedule calculations. Can be minimum, P1, P5, P10. It is
defined in Options (Calculation tab).
- Mean Duration: Duration as a result of probabilistic calculations: difference
between task's mean finish time and mean start time. It is blank for current
schedule calculation. Please note, that "Duration Mean - result" and "Duration
Mean - statistical result" can be different
- High Duration(Mean): High duration as a result of probabilistic calculations. It
is blank for current schedule calculation. Can be maximum, P90, P95, P99. It is
defined in Options (Calculation tab).
- Start Low: Low start time as a result of probabilistic calculations. It
is blank for current schedule calculation. Can be minimum,
P1,
P5, P10. It
is defined in Options (Calculation tab).Mean start
time as a result of probabilistic calculations. Will have no
value in the current schedule calculation.
- Start Mean: Mean start time as a result of probabilistic calculations. Will
haven o value in the current schedule calculation.
- Start High: High start time as a result of probabilistic
calculations. Will have no value in the current schedule calculation. Can be
maximum, P90, P95, P99. It is defined in Options (Calculation tab)
- Finish Low: Low mean finish time as a result of probabilistic calculations.
Will have no value in the current schedule calculation. Can be minimum, P1, P5,
P10. It is defined in Options (Calculation tab).
- Finish Mean: Mean finish time as a result of probabilistic
calculations. Will haven o value in the current schedule calculation.
- Finish High: High finish time as a result of probabilistic
calculations. Will have no value in the current schedule calculation. Can be
maximum, P90, P95, P99. It is defined in Options (Calculation tab)
- Low
Work: The Low work units for task for the current schedule Base
- Work: The Base
work units for task for the current schedule
- High Work : The High work units
for task for the current schedule
Setting up reports for printing
See Setting up Reports
Printing reports
Click File and choose Print.
Previewing reports
Click File and choose Print Preview.