Task Related Fields

Total Task Cost Low - result

Name of parameters (shown on the tool tip)

Total Task Cost Low - result (min, P1, P5, or P10)

Type of the field

Static Text

Short name (shown in the header)

Cost Low

Description

Total low cost (fixed task cost plus variable cost, e.g. associated with resource) as a result of probabilistic calculation. Will have no value in the current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Total Task Cost Base
Total Task Cost High- result
Total Task Cost Mean - result