Name of parameters (shown on the tool tip) |
Total Task Cost Low - result (min, P1, P5, or P10) |
|
|
Description |
Total low cost (fixed task cost plus variable cost, e.g. associated with resource) as a result of probabilistic calculation. Will have no value in
the current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).
|
|