Finish Time Mean - Result

Name of parameter (shown on the tool tip)

Finish Time Mean - result

Type of the field

Static Text

Short name (shown in the header)

Finish Mean

Description

Low finish time as a result of probabilistic calculations. Will have no value in the current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Finish Time Low
Finish Time High