Search Help:

Task Related Fields

Finish Time Low Result

Name of parameter (shown on the tool tip)

Finish Time Low - result (min, P1, P5, or P10)

Type of the field

Static Text

Short name (shown in the header)

Finish Low

Description

Low finish time as a result of probabilistic calculations. Will have no value in the current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Finish Time Mean
Finish Time High

Legal Notice Privacy Statement Copyright © Intaver Institute Inc., 2002-. All Rights Reserved.