Search Help:

Task Related Fields

Duration Low- Results

Name of parameters (shown on the tool tip)

Duration low- result

Type of the field

Static Text

Short name (shown in the header)

Low Dur

Description

Low duration as a result of probabilistic calculations. It is blank for current schedule calculations. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Duration Base- result
Duration High- result


Legal Notice Privacy Statement Copyright © Intaver Institute Inc., 2002-. All Rights Reserved.