User's Guide to  

RiskyProject Professional

Back to RiskyProject Professional
Project Risk Management and Decision Analysis 

Task Related Fields

Total Task Cost Low - result (min, P1, P5, or P10)

Name of parameters (shown on the tool tip)

Total Task Cost Low - result (min, P1, P5, or P10)

Type of the field

Static Text

Short name (shown in the header)

Low Cost

Description

Total low cost (fixed task cost plus variable cost, e.g. associated with resource) as a result of probabilistic calculation. Will have no value in the baseline calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Total Cost (Base)

Total Task Cost (High)

Total Task Cost (Mean)


 

www.intaver.com products      solutions      support      partners      technology      company

Copyright © Intaver Institute Inc., 2002-2006. All Rights Reserved