Project Risk Management and Decision Analysis 

Task Related Fields

Total Task Cost High - result (P90, P95, P99, or max)

Name of parameters (shown on the tool tip)

Total Task Cost High - result (P90, P95, P99, or max)

Type of the field

Static Text

Short name (shown in the header)

High Cost

Description

Total high cost (fixed task cost plus variable cost, e.g. associated with resource) as a result of probabilistic calculation. Will have no value in the baseline calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).

Related Fields

Total Cost (Base)

Total Task Cost (Low)

Total Task Cost (Mean)


 