Task Related Fields

Total Cost (Base)

Name of parameters (shown on the tool tip)

Total Cost (Base)

Type of the field

Static Text

Short name (shown in the header)

Tot Cost

Description

Cost associated with resources assigned to the particular task plus fixed task cost. Calculated duration baseline calculation.

Related Fields

Fixed Cost (Low)

Fixed Cost (Base)

Fixed Cost (High)

Resource Cost


 