Task Related Fields

Finish Time Low - result (min, P1, P5, or P10)  

Name of parameters (shown on the tool tip)

Finish Time Low  - result (min, P1, P5, or P10)  

Type of the field

Static Text

Short name (shown in the header)

Finish High

Description

Low finish time as a result of probabilistic calculations. Will have no value in the baseline calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab). 

Related Fields

Finish Time Base

Finish Time High


 