|
Task Related Fields
Duration Low - result (min, P1, P5, or P10)
|
Name of parameters (shown on the tool tip) |
Duration
Low - result (min, P1, P5, or P10) |
|
|
Type of the field |
Static
Text |
|
|
Short name (shown in the
header) |
Low
Dur |
|
|
Description |
Low duration as a result of probabilistic calculations. It is blank for baseline calculations. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab). |
|
|
Related
Fields |
Duration
Base - results
Duration
High - result |
|
|