Project Risk Management and Decision Analysis 

Task Related Fields

Duration High - result (min, P1, P5, or P10)

Name of parameters (shown on the tool tip)

Duration High - result (min, P1, P5, or P10)

Type of the field

Static Text

Short name (shown in the header)

High Dur

Description

High duration as a result of probabilistic calculations. It is blank for baseline calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).

Related Fields

Duration Base - results

Duration Low - result


 