User's Guide to
RiskyProject Professional
Task Related Fields
Fixed Cost - Low
Name of parameters (shown on the tool tip)
Type of the field
Edit Box with Spin Control
Short name (shown in the header)
Cost Low
Description
Low fixed cost (not associated with resources). Used for probabilistic calculation only. Particular meaning of it depends on statistical distribution for cost. See “How to define distribution for Start Time, Cost, and Duration”.
Related Fields
Cost
Cost High
Copyright © Intaver Institute Inc., 2002-2006. All Rights Reserved